{"id":3369,"date":"2019-10-29T14:24:49","date_gmt":"2019-10-29T14:24:49","guid":{"rendered":"https:\/\/cleanwateratlanta.h2o4atl.com\/?page_id=3369"},"modified":"2019-11-25T13:10:22","modified_gmt":"2019-11-25T13:10:22","slug":"niles-avenue","status":"publish","type":"page","link":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/","title":{"rendered":"Niles Avenue Sewer Improvements &#8211; C-1190023"},"content":{"rendered":"<div class=\"ui--image-wrap clearfix text-center ui--block\"><img loading=\"lazy\" decoding=\"async\"  id=\"ui--image-1\" class=\"ui--image ui--animation\" src=\"https:\/\/cleanwateratlanta.h2o4atl.com\/wp-content\/uploads\/2019\/11\/3020-routine-inspection-inside-existing-penstock-edit-1450x450.jpg\" alt=\"\" title=\"Richland-Creek-Water-Supply-Program-Finished-Water-Transmission-Main-Phase-I-7-1140x645\" data-at2x=\"\" width=\"1450\" height=\"450\"\/><\/div><h3 id=\"custom-title-h3-1\" class=\"ui--animation \" style=\"text-align: center; \">PROJECT OVERVIEW<\/h3><div class=\"auto-format ui--animation\"><p>The purpose of this project is to eliminate the occurrence of repeat sewer overflows due to severe concrete and debris blockage from an active recycled concrete facility located northwest of Marietta Boulevard NW and Niles Avenue NW. The pipeline will redirect the current extraneous flows from the existing 12 inch and 15 inch sanitary sewer trunk lines. The existing 15 inch sewer line will be realigned and roughly 2,100 linear feet of 18 inch ductile iron pipe encased in a 36 inch steel sleeve will be installed. Approximately 8 new manholes will be installed along the sewer realignment.<br \/><\/br><br \/>\n<strong>WHAT KIND OF WORK WILL BE PERFORMED?<\/strong><br \/>\nThe City uses various techniques to repair, replace and realign aging sewer lines. The scope of this project and method of construction will consist of micro tunneling to carry wastewater flows from the existing sewer line to a new sewer line which will connect to new manholes. The process is cost effective, protects the environment, and allows deep installation of pipe under existing utilities.<br \/><\/br><br \/>\n<strong>WHAT TO EXPECT<\/strong><br \/>\nResidents and businesses within the project area may experience a disruption of service with lane and road closures, detours, work on private property and noise during construction. However, we will notify impacted residents and businesses through letters, door hangers or face-to-face prior to work starting in the area. City representatives will also attend NPU meetings to discuss planned work and provide periodic updates.<br \/><\/br><br \/>\n<strong>WHAT ARE THE BENEFITS OF THE PROJECT?<\/strong><br \/>\nThe improvements will extend the life of the sewer 50+ years while meeting the requirements of the First Amended Consent Decree (FACD). Structural upgrades to the system are necessary to replace aging and deteriorated sewers to maintain the reliability of the sewers. Rehabilitation of the sanitary sewers reduces the amount of extraneous flows and,<br \/>\n\u2022 Reduces sanitary sewer overflow (SSO) events due to structural defects<br \/>\n\u2022 Ensures adequate capacity to accommodate future economic growth<br \/>\nand development<br \/>\n\u2022 Provides sanitary sewer overflow (SSO) Control projects with life-cycle cost savings<br \/>\n\u2022 Minimizes environmental objections<br \/><\/br><br \/>\n<strong>WHO WILL BE IMPACTED?<\/strong><br \/>\nThe City will be working in sewershed PRC05, situated within the Proctor Creek Basin. The work affects Council District 3 and NPU K. The sewer line is located in the area between 1277 Niles Avenue and 1530 Marietta Boulevard.<\/p>\n<\/div><div class=\"auto-format ui--animation\"><p><strong>STAY INFORMED<\/strong><br \/>\nSign-up to receive project updates by emailing Asa Porter, Public Information Officer for the Niles Avenue Sewer Realignment Project at <a href=\"mailto:asporter@atlantaga.gov\">asporter@atlantaga.gov<\/a>.<br \/>\nProject Start: 4th Qtr. 2019<br \/>\nEstimated Project End: 3rd Qtr. 2020<br \/>\nProject Manager: Rosalind Horne<br \/>\nContractor: Garney Construction<\/p>\n<\/div><div class=\"auto-format ui--animation\"><p><a href=\"http:\/\/coadwm.maps.arcgis.com\/apps\/webappviewer\/index.html?id=b58f8515eb83409791d6e2ff79b1bef5&#038;center=-84.4277,33.781&#038;level=17\" target=\"_blank\">Niles Avenue Interactive Map<\/a><\/p>\n<\/div><div class=\"ui--image-wrap clearfix text-center ui--block\"><img decoding=\"async\"  id=\"ui--image-2\" class=\"ui--image ui--animation\" src=\"https:\/\/cleanwateratlanta.h2o4atl.com\/wp-content\/uploads\/2019\/10\/Niles-Ave-Map.png\" alt=\"\" title=\"\" data-at2x=\"\"\/><\/div>","protected":false},"excerpt":{"rendered":"<p>PROJECT OVERVIEWThe purpose of this project is to eliminate the occurrence of repeat sewer overflows due to severe concrete and debris blockage from an active recycled concrete facility located northwest of Marietta Boulevard NW and Niles Avenue NW. The pipeline will redirect the current extraneous flows from the existing 12 inch and 15 inch sanitary [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-sidebar-left.php","meta":{"footnotes":""},"class_list":["post-3369","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Niles Avenue Sewer Improvements - C-1190023 - Consent Decree<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Niles Avenue Sewer Improvements - C-1190023 - Consent Decree\" \/>\n<meta property=\"og:description\" content=\"PROJECT OVERVIEWThe purpose of this project is to eliminate the occurrence of repeat sewer overflows due to severe concrete and debris blockage from an active recycled concrete facility located northwest of Marietta Boulevard NW and Niles Avenue NW. The pipeline will redirect the current extraneous flows from the existing 12 inch and 15 inch sanitary [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/\" \/>\n<meta property=\"og:site_name\" content=\"Consent Decree\" \/>\n<meta property=\"article:modified_time\" content=\"2019-11-25T13:10:22+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/\",\"url\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/\",\"name\":\"Niles Avenue Sewer Improvements - C-1190023 - Consent Decree\",\"isPartOf\":{\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/#website\"},\"datePublished\":\"2019-10-29T14:24:49+00:00\",\"dateModified\":\"2019-11-25T13:10:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Niles Avenue Sewer Improvements &#8211; C-1190023\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/#website\",\"url\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/\",\"name\":\"Consent Decree\",\"description\":\"Clean Water Atlanta\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Niles Avenue Sewer Improvements - C-1190023 - Consent Decree","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/","og_locale":"en_US","og_type":"article","og_title":"Niles Avenue Sewer Improvements - C-1190023 - Consent Decree","og_description":"PROJECT OVERVIEWThe purpose of this project is to eliminate the occurrence of repeat sewer overflows due to severe concrete and debris blockage from an active recycled concrete facility located northwest of Marietta Boulevard NW and Niles Avenue NW. The pipeline will redirect the current extraneous flows from the existing 12 inch and 15 inch sanitary [&hellip;]","og_url":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/","og_site_name":"Consent Decree","article_modified_time":"2019-11-25T13:10:22+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/","url":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/","name":"Niles Avenue Sewer Improvements - C-1190023 - Consent Decree","isPartOf":{"@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/#website"},"datePublished":"2019-10-29T14:24:49+00:00","dateModified":"2019-11-25T13:10:22+00:00","breadcrumb":{"@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/niles-avenue\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cleanwateratlanta.h2o4atl.com\/"},{"@type":"ListItem","position":2,"name":"Niles Avenue Sewer Improvements &#8211; C-1190023"}]},{"@type":"WebSite","@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/#website","url":"https:\/\/cleanwateratlanta.h2o4atl.com\/","name":"Consent Decree","description":"Clean Water Atlanta","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cleanwateratlanta.h2o4atl.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages\/3369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/comments?post=3369"}],"version-history":[{"count":5,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages\/3369\/revisions"}],"predecessor-version":[{"id":3544,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages\/3369\/revisions\/3544"}],"wp:attachment":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/media?parent=3369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}