{"id":1553,"date":"2016-11-14T19:08:55","date_gmt":"2016-11-14T19:08:55","guid":{"rendered":"http:\/\/cleanwateratl.co.nf\/?page_id=1553"},"modified":"2019-06-21T16:29:42","modified_gmt":"2019-06-21T16:29:42","slug":"small-diameter-projects","status":"publish","type":"page","link":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/","title":{"rendered":"Small Diameter Rehabilitation"},"content":{"rendered":"<div class=\"ui--image-wrap clearfix\"><img loading=\"lazy\" decoding=\"async\"  id=\"ui--image-1\" class=\"ui--image ui--animation\" src=\"https:\/\/cleanwateratlanta.h2o4atl.com\/wp-content\/uploads\/2016\/11\/DSC_0173-1200x450.jpg\" alt=\"\" title=\"dsc_0173\" data-at2x=\"\" width=\"1200\" height=\"450\"\/><\/div><h3 id=\"custom-title-h3-1\" class=\"ui--animation \" style=\"text-align: center; \">Small Diameter Projects<\/h3><div class=\"auto-format ui--animation\"><p>Small Diameter Rehabilitation consists of defined scope contracts that propose to rehabilitate the small diameter sanitary sewers, typically 8-inch \u2013 24-inches in diameter, that were identified as requiring repairs under the Sewer System Evaluation Survey (SSES) and required by the First Amended Consent Decree. Under these projects small diameter sewers will be rehabilitated utilizing such methods as: cured-in-place pipe lining techniques (CIPP), pipe bursting (PB), horizontal directional drilling and conventional excavation. Work will also consist of the rehabilitation of manholes and also includes pre-cleaning of manholes and sewers. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order to maintain the reliability of the sewers.<\/p>\n<\/div><div class=\"auto-format ui--animation\"><p>\n<table id=\"tablepress-1\" class=\"tablepress tablepress-id-1\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Project Name <\/th><th class=\"column-2\">Watershed <\/th><th class=\"column-3\">Council District <\/th><th class=\"column-4\">Status<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 1 PB Contract A<\/td><td class=\"column-2\">South River Basin<\/td><td class=\"column-3\">1, 12<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 1 PB Contract B<\/td><td class=\"column-2\">Utoy Creek Basin<\/td><td class=\"column-3\">4, 10, 11, 12<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 1 PB Contract C<\/td><td class=\"column-2\">Peachtree Creek Basin <\/td><td class=\"column-3\">7, 8<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 1 CIPP Contract A<\/td><td class=\"column-2\">Utoy Creek Basin<\/td><td class=\"column-3\">4,10<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 1 CIPP Contract B<\/td><td class=\"column-2\">Utoy Creek Basin<\/td><td class=\"column-3\">4, 10, 11, 12<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 1 CIPP Contract C<\/td><td class=\"column-2\">Peachtree Creek Basin <\/td><td class=\"column-3\">7, 8<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 CIPP Contract A<\/td><td class=\"column-2\">Peachtree Creek Basin <\/td><td class=\"column-3\">6, 7<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 CIPP Contract B<\/td><td class=\"column-2\">Peachtree Creek Basin <\/td><td class=\"column-3\">6, 7, 8<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 CIPP Contract C<\/td><td class=\"column-2\">Proctor Creek Basin<\/td><td class=\"column-3\">2, 3, 9<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 CIPP Contract D<\/td><td class=\"column-2\">Utoy Creek Basin<\/td><td class=\"column-3\">10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 PB Contract A<\/td><td class=\"column-2\">Peachtree Creek Basin <\/td><td class=\"column-3\">6, 7<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 PB Contract B<\/td><td class=\"column-2\">Peachtree Creek Basin <\/td><td class=\"column-3\">6, 7, 8<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 PB Contract C<\/td><td class=\"column-2\">Proctor Creek Basin<\/td><td class=\"column-3\">2, 3, 9<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">Sewer Group 1 Phase 2 PB Contract D<\/td><td class=\"column-2\">Utoy Creek Basin<\/td><td class=\"column-3\">10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">Sewer Group 2  Phase 1 CIPP  Contract A<\/td><td class=\"column-2\">Utoy Creek Basin<\/td><td class=\"column-3\">4, 10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 1 CIPP Contract A1<\/td><td class=\"column-2\">South River Basin<\/td><td class=\"column-3\">1, 4, 12<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 1 CIPP Contract B<\/td><td class=\"column-2\">Long Island Creek Basin, Nancy Creek Basin, Peachtree Creek Basin<\/td><td class=\"column-3\">8, 9<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">Sewer Group 2 CIPP Contract D<\/td><td class=\"column-2\">Proctor Creek Basin, Peachtree Creek Basin, Sugar Creek Basin<\/td><td class=\"column-3\">5, 6, 7, 8, 9<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">Sewer Group 2 CIPP Contract E<\/td><td class=\"column-2\">Proctor Creek Basin, Sandy Creek Basin, Utoy Creek Basin<\/td><td class=\"column-3\">3, 4, 9, 10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 1 CIPP Contract F<\/td><td class=\"column-2\">Camp Creek Basin, Utoy Creek Basin<\/td><td class=\"column-3\">10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 1 PB Contract A<\/td><td class=\"column-2\">Utoy Creek Basin<\/td><td class=\"column-3\">4, 10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 1 PB Contract A1<\/td><td class=\"column-2\">South River Basin<\/td><td class=\"column-3\">1, 4, 12<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 1 PB Contract B<\/td><td class=\"column-2\">Long Island Creek Basin, Nancy Creek Basin, Peachtree Creek Basin<\/td><td class=\"column-3\">8, 9<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 2 PB Contract C<\/td><td class=\"column-2\">Peachtree Creek Basin, Sugar Creek Basin<\/td><td class=\"column-3\">5, 6, 7, 8<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">Sewer Group 2 Phase 1 PB Contract F<\/td><td class=\"column-2\">Camp Creek Basin, Utoy Creek Basin<\/td><td class=\"column-3\">10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">South River PB<\/td><td class=\"column-2\">Utoy Creek Basin, South River Basin, <\/td><td class=\"column-3\">1, 10, 11, 12<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">Proctor Creek and Sandy Creek<\/td><td class=\"column-2\">Sandy Creek Basin, Proctor Creek Basin<\/td><td class=\"column-3\">3, 4, 9, 10, 11<\/td><td class=\"column-4\">Complete <\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">Sewer Group 3 Rehabilitation Contract B<\/td><td class=\"column-2\">Long Island Creek Basin, Proctor Creek Basin, Peachtree Creek Basin, Sandy Creek Basin, <\/td><td class=\"column-3\">3, 4, 8, 9, 10<\/td><td class=\"column-4\">Active<\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">Sewer Group 3 Rehabilitation Contract C<\/td><td class=\"column-2\">Camp Creek Basin, Utoy Creek Basin<\/td><td class=\"column-3\">4, 10, 11<\/td><td class=\"column-4\">Active<\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">Sewer Group 3 Rehabilitation Contract D<\/td><td class=\"column-2\">Sugar Creek Basin<\/td><td class=\"column-3\">5<\/td><td class=\"column-4\">Active<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-1 from cache --><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Small Diameter ProjectsSmall Diameter Rehabilitation consists of defined scope contracts that propose to rehabilitate the small diameter sanitary sewers, typically 8-inch \u2013 24-inches in diameter, that were identified as requiring repairs under the Sewer System Evaluation Survey (SSES) and required by the First Amended Consent Decree. Under these projects small diameter sewers will be rehabilitated [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-sidebar-left.php","meta":{"footnotes":""},"class_list":["post-1553","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Small Diameter Rehabilitation - Consent Decree<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Small Diameter Rehabilitation - Consent Decree\" \/>\n<meta property=\"og:description\" content=\"Small Diameter ProjectsSmall Diameter Rehabilitation consists of defined scope contracts that propose to rehabilitate the small diameter sanitary sewers, typically 8-inch \u2013 24-inches in diameter, that were identified as requiring repairs under the Sewer System Evaluation Survey (SSES) and required by the First Amended Consent Decree. Under these projects small diameter sewers will be rehabilitated [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Consent Decree\" \/>\n<meta property=\"article:modified_time\" content=\"2019-06-21T16:29:42+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/\",\"url\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/\",\"name\":\"Small Diameter Rehabilitation - Consent Decree\",\"isPartOf\":{\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/#website\"},\"datePublished\":\"2016-11-14T19:08:55+00:00\",\"dateModified\":\"2019-06-21T16:29:42+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Small Diameter Rehabilitation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/#website\",\"url\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/\",\"name\":\"Consent Decree\",\"description\":\"Clean Water Atlanta\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/cleanwateratlanta.h2o4atl.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Small Diameter Rehabilitation - Consent Decree","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/","og_locale":"en_US","og_type":"article","og_title":"Small Diameter Rehabilitation - Consent Decree","og_description":"Small Diameter ProjectsSmall Diameter Rehabilitation consists of defined scope contracts that propose to rehabilitate the small diameter sanitary sewers, typically 8-inch \u2013 24-inches in diameter, that were identified as requiring repairs under the Sewer System Evaluation Survey (SSES) and required by the First Amended Consent Decree. Under these projects small diameter sewers will be rehabilitated [&hellip;]","og_url":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/","og_site_name":"Consent Decree","article_modified_time":"2019-06-21T16:29:42+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/","url":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/","name":"Small Diameter Rehabilitation - Consent Decree","isPartOf":{"@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/#website"},"datePublished":"2016-11-14T19:08:55+00:00","dateModified":"2019-06-21T16:29:42+00:00","breadcrumb":{"@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/small-diameter-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cleanwateratlanta.h2o4atl.com\/"},{"@type":"ListItem","position":2,"name":"Small Diameter Rehabilitation"}]},{"@type":"WebSite","@id":"https:\/\/cleanwateratlanta.h2o4atl.com\/#website","url":"https:\/\/cleanwateratlanta.h2o4atl.com\/","name":"Consent Decree","description":"Clean Water Atlanta","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cleanwateratlanta.h2o4atl.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages\/1553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/comments?post=1553"}],"version-history":[{"count":5,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages\/1553\/revisions"}],"predecessor-version":[{"id":2968,"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/pages\/1553\/revisions\/2968"}],"wp:attachment":[{"href":"https:\/\/cleanwateratlanta.h2o4atl.com\/index.php\/wp-json\/wp\/v2\/media?parent=1553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}